| Pricing |
| |
| Level(3) Internet Access Monthly Recurring Charge |
| |
 |
|
1 to 4 mbps USD150 per mbps |
 |
|
5 to 9 mbps USD140 per mbps |
 |
|
10 to 19 mbps USD100 per mbps |
 |
|
20 to 49 mbps USD85 per mbps |
 |
|
50 to 99 mbps USD75 per mbps |
 |
|
5 mbps minimum charge per month |
 |
|
Invoiced based on the 95th percentile |
 |
|
SLA (Service Level Agreement): 99.999% |
 |
|
Level(3)™ cross connect at no additional charge |
 |
|
Unlimited IP addresses with justification |
| |
| Fast Ethernet Non-Recurring Setup Fee |
| |
 |
|
USD625 for 1 Fast Ethernet Port |
| |
| Additional Info |
| |
 |
|
Installation takes 15 business days to complete. |
 |
|
Expedite option completes install in less than 10 business days. |
| |
| Carrier |
| |
 |
|
Level(3)™ |
| |
| Connection Type |
| |
 |
|
Direct Connection to Level(3) Equipment via Fast Ethernet or Fiber burstable to: 10, 100, or 1000 mbps. |
| |
|
| |
| Building Overview |
| |
 |
|
Modern data centre facility situated in Amsterdam Southeast |
 |
|
Operational since June 1999 |
 |
|
Technical space arranged over two floors |
 |
|
Total size (technical space): 10,073 m2 |
 |
|
Available fully fitted space: 4,000 m2 |
 |
|
Maximum site power: 5 MVA |
 |
|
Carrier connectivity: Level 3, Colt, Carrier One, Versatel, KPN, |
| |
|
BTIgnite, Eurofiber, WorldCom, UPC |
| |
| Technical Summary |
| |
| Main Power |
| |
 |
|
Duel redundant 5MVA, HV dedicated underground cable feeds to 2 x |
| |
|
dedicated redundant 2.5MVA transofrmer substations |
| |
| Generators |
| |
 |
|
Two (three ultimate) x 1.5MVA diesel-driven emergency power |
| |
|
generators on different power distribution systems giving 3MVA |
 |
|
(4.5MVA ultimate) |
 |
|
Automatic start in less than one minute to feed 100% of the facility |
 |
|
Generators tested quarterly |
 |
|
Fuel storage for 24-hour continuous operation at 100% load |
 |
|
24 x 7 agreement with local fuel supplier |
| |
| UPS |
| |
 |
|
Two separate systems - two x 625kVA and two (five ultimate) x |
| |
|
625kVA Hybrid Rotary UPS modules providing 2500kVA (4375kVA |
| |
|
ultimate) total output with N+1 redundancy |
 |
|
15-minute battery autonomy per UPS module |
 |
|
Underfloor power track distribution system |
| |
| DC |
| |
 |
|
8000 amps 48VDC power system for Telecom Network Equipment |
 |
|
Single bus systems with dual-redundant A & B distribution |
 |
|
Four hours of battery autonomy |
 |
|
Underfloor direct A and B feeds from PDU to fuse panel |
| |
| Environment |
| |
 |
|
750W/m2 average cooling capability over the gross space |
 |
|
Temperature regulated overall to 21°C ± 2°C |
 |
|
Humidity regulated overall to 50%RH ± 10% |
 |
|
Technical areas positively pressurized to minimize dust ingress |
| |
| Physical |
| |
 |
|
Minimum floor-to-ceiling clearance: 2,975mm from top of raised floor |
 |
|
750mm raised floor height (depending on floor) |
 |
|
Raised Floor Loading: 14kN/m2 |
 |
|
Structural Floor Slab: 25kN/m2 on ground floor, 3kN/m2 on first floor |
| |
| Fire Strategy |
| |
 |
|
Use of non-inflammable and low-smoke zero halogen materials where |
| |
|
possible |
 |
|
No storage (especially of flammable materials) within technical space |
 |
|
Building split into sealed, independent, fire compartments |
 |
|
Early warning detection via Very Early Smoke Detection Alarm |
| |
|
(VESDA) |
 |
|
Double-interlocked pre-action dry pipe sprinkler system |
| |
| Security |
| |
 |
|
Full electronic access control system, based on Proximity cards and |
| |
|
PIN keypad. Biometric Palm-scanners for colocation areas. |
 |
|
Intruder detection system on escape and riser doors |
| |
| Closed Circuit Television (CCTV) |
| |
 |
|
CCTV monitoring and recording of all access points and circulation |
| |
|
areas |
| |
| Building Monitoring System (BMS) |
| |
 |
|
Location Operations and Control Centre |
 |
|
Network monitoring system with critical alarm repeating to Regional |
| |
|
Management Centre |
 |
|
24 x 7 local monitoring and logging of temperature and humidity |
| |
|
conditions and alarms |
 |
|
Full perimeter under-floor leak detection linked to building monitoring |
| |
|
system |
| |
| Telecom Infrastructure |
| |
 |
|
Facility is designed to accommodate standard rack/cabinets of |
| |
|
2,200mm nominal height |
 |
|
Power and copper cabling normally distributed under floor; fibre |
| |
|
cabling distributed overhead within a managed containment system |
 |
|
Fibre entry to the building is via four independent points |
| |
| General Facilities |
| |
 |
|
Dedicated loading area (40 m2) |
 |
|
Three customer test rooms (10 m2 each) and storage area (50 m2) |
 |
|
Goods lift (maximum load of 2,500kg), 1.4m wide x 2.4m high |
 |
|
While not a standard offering, the roof space is capable of housing |
| |
|
antennae equipment |
| |